We sponsored ourselves: Grab a GN Modmat, solder mat, dice kit, or shirt on the store! https://store.gamersnexus.net/This video delves into the topic of "Fak...
Is it really down to TSMC being unable to keep up? It seems plausible but I didn’t notice anything in the video to support it. Are there other sources that point to it as the problem?
TSMC is also basically the only supplier, which is a reason the US and EU push so much for their own production lines, although it looks like the US wants to stop theirs.
NVIDIA used Samsung for one generation, people are saying because of the deal they got, but went back to TSMC, apparently because of yield issues.
Intel was behind schedule for a long time, and even used TSMC for their current line up, but I think their new 18A process is supposed to come this year, who knows how that will turn out.
For NVIDIA specifically I’ve also heard that the HBM chips for the high-end AI cards are also a bottleneck, otherwise we might get even fewer consumer GPUs, but I never followed up on that.
You are not logged in. However you can subscribe from another Fediverse account, for example Lemmy or Mastodon. To do this, paste the following into the search field of your instance: [email protected]
No game suggestions, friend requests, surveys, or begging.
No Let’s Plays, streams, highlight reels/montages, random videos or shorts.
No off-topic posts/comments, within reason.
Use the original source, no clickbait titles, no duplicates.
(Submissions should be from the original source if possible, unless from paywalled or non-english sources.
If the title is clickbait or lacks context you may lightly edit the title.)
Is it really down to TSMC being unable to keep up? It seems plausible but I didn’t notice anything in the video to support it. Are there other sources that point to it as the problem?
Edit — for circumstantial evidence I did find this: https://wccftech.com/tsmc-reaches-100-percent-utilization-5nm-3nm-supply/
TSMC is the only manufacturer capable of 4nm fabs. So, yes?
Sources similar to yours, and I think that’s been the case for years: https://www.digitimes.com/news/a20250109PD237/tsmc-54nm-3nm-capacity-2025.html https://www.tomshardware.com/tech-industry/semiconductors/tsmcs-arizona-chip-fab-production-is-sold-out-through-late-2027
TSMC is also basically the only supplier, which is a reason the US and EU push so much for their own production lines, although it looks like the US wants to stop theirs.
NVIDIA used Samsung for one generation, people are saying because of the deal they got, but went back to TSMC, apparently because of yield issues.
Intel was behind schedule for a long time, and even used TSMC for their current line up, but I think their new 18A process is supposed to come this year, who knows how that will turn out.
For NVIDIA specifically I’ve also heard that the HBM chips for the high-end AI cards are also a bottleneck, otherwise we might get even fewer consumer GPUs, but I never followed up on that.