Chinese electric vehicle (EV) manufacturer BYD has introduced a new charging platform that claims to reduce charging times to match the refuelling speed of petrol vehicles. The company also announced plans to build a network of fast-charging stations across China, marking a significant shift in its approach to EV infrastructure. The company’s founder, Wang Chuanfu, unveiled the ‘Super e-Platform’ at an event streamed from BYD’s headquarters in Shenzhen on Monday, as reported by Reuters.

BYD 1,000 kW charging speeds and infra plans The new platform boasts peak charging speeds of 1,000 kilowatts (kW), allowing EVs to gain 400 km (249 miles) of range in just five minutes.

This is double the speed of Tesla’s latest Superchargers, which currently offer a maximum of 500 kW. The innovation aims to tackle one of the biggest barriers to EV adoption – charging time.

The company also announced its intention to build more than 4,000 ultra-fast charging stations across China to complement the new platform. However, BYD has not disclosed a specific timeline for the project or the amount it plans to invest.

The charging platform will initially be available in two upcoming BYD models – the Han L sedan and the Tang L SUV – priced from 270,000 yuan (around $37,400). These vehicles will be built on BYD’s e-Platform 3.0, which integrates multiple EV technologies, including:

@[email protected]
link
fedilink
English
516d

The biggest chargers I commonly see are 350kW. That’s about 15 miles per minute. The NACS connector doesn’t have a max amp spec, but at 800v/650A that’s just over 500kW. CCS has a similar limit. The cables also get ridiculous above 500kW, but higher system voltages can reduce that.

Of course, they’re working on a 3.75 megawatt connector

https://en.wikipedia.org/wiki/Megawatt_Charging_System

@[email protected]
link
fedilink
English
216d

3,000 amps at 1,250 volts

That is in insane number to wrap my head around

Dave.
link
fedilink
1
edit-2
15d

It’s difficult on the back end of the charger as well.

A shopping centre or rest stop can’t just spring for a few high capacity chargers for the car park. A single megawatt charger is 50 houses worth of consumption, so they now need a substation upgrade to provide what is basically a whole neighbourhood-equivalent of power.

Create a post

This is the official technology community of Lemmy.ml for all news related to creation and use of technology, and to facilitate civil, meaningful discussion around it.


Ask in DM before posting product reviews or ads. All such posts otherwise are subject to removal.


Rules:

1: All Lemmy rules apply

2: Do not post low effort posts

3: NEVER post naziped*gore stuff

4: Always post article URLs or their archived version URLs as sources, NOT screenshots. Help the blind users.

5: personal rants of Big Tech CEOs like Elon Musk are unwelcome (does not include posts about their companies affecting wide range of people)

6: no advertisement posts unless verified as legitimate and non-exploitative/non-consumerist

7: crypto related posts, unless essential, are disallowed

  • 1 user online
  • 16 users / day
  • 60 users / week
  • 315 users / month
  • 1.87K users / 6 months
  • 1 subscriber
  • 3.34K Posts
  • 45.3K Comments
  • Modlog